Understanding The Roles of Building Designers

Building Design

The task of hiring building designers is not that easy. A lot of research has to be done before signing up with a good company. To make this process easier, you must understand the roles of the entire team.

At first, the designer or the architect of the building designing team assumes the overall responsibility for the project. The designer prioritises each of the materials required to complete the project and ensures that the work is carried out in compliance with existing laws and regulations.

The working team

working team of home builders

The designer works with the engineer and architect to plan the building layout. Generally the head of the team or the owner becomes the spokesperson when resolving conflicts with the contractor or suppliers. Quality residential home builders in Geraldton produce drawings and functional specifications that comply with laws, regulations and your requirements. As your representatives, they inspect the work to ensure that it is carried out according to the drawings and specifications.

The main contractor or the project manager takes full responsibility for the construction work, including, determining the work schedule, number of workers required for the project and also to hire the best professionals appropriate for the project. Subcontractors are often hired if workers need to be increased for completion. These projects are often huge and need to be completed on time.

The designer gives business to the building materials suppliers on a regular basis. This is why the suppliers have a good business relationship with the designer and provide the best materials at cheaper rates. These materials also meet industry standards.

Know how to resolve conflicts

resolve conflicts person

When you encounter any obstacle, find out who is the best person to solve the problem. In general, all parties with whom you have signed a contract must guarantee that their work complies with the terms of the contract. This means the designer or the architect is liable for any defects resulting from the work of subcontractors or others hired. A contractor is legally obliged to meet established standards and construct a building free of dangerous defects.

Under the Civil Code of Australia, designers, contractors, subcontractors and developers are jointly liable for all defects in workmanship for one year. In the case of major defects, this liability is extended to a period of five years after completion of the project.

Working with the building designer team lets you complete your project within time while maintaining the codes.


Adding Deck To Your Single Story House Plan

Adding Deck ToHouse

A ground-level deck is a great idea to relax in the soothing evening winds and it is generally safer and easier to build than a multi-story deck. A deck means a lot to a single story house plan that adds usable space with elegance.

The Placement

Most of the homeowners generally choose to build decks directly off of shared living areas like living room, kitchen, or dining room. This approach can bring access and flow only if these considerations are made.

The Sun, shade and the wind plays a vital part in building decks. Find out which location will be the most comfortable during the usage hours. If you’re not quite sure consult it with a local builder in Geraldton. Some places in Western Australia experience summer throughout the year, thus, people who are living in these areas must build a deck where afternoon and evening shade can be enjoyed in a relaxing mood.

On the contrary, people who are located in places that experience moderate rainfall (especially in the coastal area), decks can bring in a sunny location which becomes more appealing even if it is a bit nippy outside.


When you ‘re building a deck around a pool make sure you have sufficient privacy in the area. Consider installing Colorbond fences, lattice, and screen that provides great privacy to most Australian homes. It is very strong and durable.

Deck Materials

Nothing can be more cost-effective than pressure treated wood when it comes to building a deck. Most of the homeowners prefer staying away from it due to the chemicals in it which creates nasty splinters. Cedar and other naturally rot-resistant timbers can also be a great idea. Again, if you are not sure enough, consider calling a local builder to understand your specifications.

You can also opt to stain wood to almost any color you like, but this process generally needs refinishing the deck every year or two to maintain the aesthetic appeal.

Deck Amenities

Railing, lighting, and seating are optional when building a deck to your house plan. These aspects add a more polished look to the decking area. It is recommended to incorporating them into your deck design only through professionals. Railings are a great idea. It’ll keep the area safe. Lighting can make the deck more appealing throughout the year. Make sure to install the wiring safely if you’re located in monsoon prone areas.

Deck is a great place of leisure. Build it uniquely so that you can relax after a tiring day.


What Is Tilt Panel Construction?

Tilt Panel Construction.jpg

Nowadays, construction using tilt panels is commonly preferred due to various benefits like cost-effectiveness and eco-friendly factor. As such, it has been popularised as the most ideal commercial construction in Geraldton and other areas of Western Australia. Apart from being economical, it is also very easy to build, since the walls or panels are cast right on site on a bed or floor slab.

When building with tilt panels, the formwork for each of them is made as per custom specifications. In other words, all formworks are created in the required shape and size, so as to easily accommodate doors or windows into a panel. Later on, reinforcing and steel bars are also added for greater strength.

As soon as a formwork is ready, concrete is poured into it and left to dry. After the concrete becomes hard, the workers apply a bond breaker in order to pour a second tilt panel on top of the first one. The entire process is repeated several times until there is a stack of panels, practically the concrete walls. Next, the formwork or mould is removed so that the walls can be lifted with the help of a crane and placed in position.

Prior to being lifted, the panels are secured with braces so that the crane has something to grab them by. The workers then help in guiding the walls into their respective positions. At first, the panels are supported temporarily by means of props. Later on, however, they are patched for completing the structure. Also, the joints in between them are sealed to prevent water from penetrating through.


The primary perk of opting for tilt up construction is the fact that it requires very less time for completion, sometimes even less than 24 hours. Harsh winter conditions are not a hindrance to it as well, since an entire establishment can be erected quicker than traditional construction. The durability of tilt panels is also outstanding – they can resist moisture damage, windstorms, fires and even earthquakes. As has been mentioned, they are highly economical too. Moreover, the concrete walls reduce cooling and heating peaks, thereby decreasing operating costs. In addition to that, they can accept a wide range of aesthetic solutions. And if constructed by experienced professionals, they are bound to last for more than half a century.

Thus, if you have been planning to invest in tilt up panels, know that it would be a prudent and competitive decision.